reposition all equipment into its new location

Project management and implementation to reposition 50 tons of equipment to integrate with new equipment

installation of machine throught the roof with 200 ton crane

We designed the lifting equipment and carried out the complete installation of a 16 ton machine through a hole in the roof at 40 meter radius.

Final position of the 16 ton machine

Machine lowered through the roof to its location.

12 meter long conveyor removed and repaired within a tight time scale.

 

 

 

Repair to a 12 mtr conveyor